Value: £3.1M
Duration: 2.5 Years
Scope of Works: Complete package of groundworks for the construction and handing over of four large warehouse units: Excavation and clearance of the derelict site, installation of drainage, ducting and retaining walls in preparation for the buildings. Foundations poured and access roads built to Highways specifications. Completion of the development with tarmac car parks and landscaping elements.
Value: £1.8m
Duration: 2.5 Years
Scope of Works: Urban regeneration: all groundworks for new houses up to block and beam level. Develop new and transform the existing area with hard and soft landscaping, new roads, footpaths and car parks.
Value: £1.4m
Duration: 2 Years
Scope of Works: Social Housing regeneration: Improving properties with access ramps, rails and new footpaths to comply with the Equality Act 2010 regulations. Work also included drainage around properties, install fences and gates, flag and tarmac hard standings.
Value: £1,155,000
Duration: 1 Year 4 Months
Scope of Works: Phase 1 Upgrade car park and access routes of an existing industrial estate. Works included clearance of existing hard standing, excavation for services, pour of new concrete slab and kerbing. Hard and soft landscaping, tarmac and white lining.
Also foundations and drainage for the large industrial building
Value: £900k
Duration: 5 Months
Scope of Works: Hard and soft landscaping of a modern new development of mid-rise apartments, social housing and retail spaces. Kerbing and paving of the walkways and footpaths, installation of the street furniture and construction of seating zones and planted areas. 278 works to ensure the development ties in seamlessly with the main highway.
Value: £850k
Duration: 12 Months
Scope of Works: The refurbishment of the historic Market Hall in Glossop, Derbyshire involved hard landscaping techniques to be laid inside the building replicating its original features. Large York Stone flags were cleaned and relaid in the main hall. Stone steps constructed to connect the different floors of the building and an impressive new accessible entrance built with further York Stone. Repairs to the granite sett loading areas around the building completed our work on this impressive transformation. Pour of internal polishished concrete floor surrounding flags.
Value: £550,000
Duration: 20 weeks
Scope of Works: Hard Landscaping of the striking podiums linking luxury residential accommodation to the riverside at the transformational Pomona Island development. Installation of permeable block paving and concrete flags on a sand/cement bed around the area.
Value: £520,000
Duration: 1 year
Scope of Works: Extension to school: Installation of drainage to damp-proof level, footings and concrete slab for new classrooms, preparation and installation of MUGA pitch, hard and soft landscaping around the school grounds and a new car park
Value: £390,000
Duration: 25 Weeks
Scope of Works: Installation of granite and concrete paving as part of the City of Culture 2017 Public Realm works in the city.
Value: £250,000
Duration: 14 Weeks
Scope of Works: Installation of granite paving as part of the retail and leisure expansion project.
Value: £250,000
Duration: 15 Weeks
Scope of Works: Installation of natural stone flagging around a high rise city centre PRS apartments development. Hard landscaping on the roof terraces consisting of laying flags on pedestals.
Value: £145,000
Duration: 9 Weeks
Scope of Works: On a development of 14 new shared ownership homes, Hopkinson CE installed porous and non porous block paving parking spaces for each home, block paved footpaths and road. 278 Works were undertaken to develop a safe entrance way to the close from the main highway.